Sign In | Join Free | My burrillandco.com
Home > Concrete Mixing Plant >

MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour

Achieve Innovations (Changsha) Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers
     
    Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers
    • Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers
    • Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers
    • Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers
    • Buy cheap MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour from wholesalers

    MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour

    Ask Lasest Price
    Brand Name : Achieve
    Model Number : HZS60
    Price : USD 52000--90000 per set
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20 set per month
    Delivery Time : 35 days
    • Product Details
    • Company Profile

    MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour

    60--240 Cbm Per Hour Ready Mixed Concrete Batching Plant Test-Run


    concrete batching plant Test-run

    5.4 1. No-load test-run

    - Before start-up, check and remove the foreign matters from the mixing drum of the mixer, measuring hoppers, fines silos

    and batchers, which are caused by construction operations.

    - After completion of unit test-run, carry out combined test-run at no-load conditions. After energizing PC, rotate the manual/auto

    switch to “auto” position, select one prescription and set the inputs of the materials measured as zero. Start up the program

    and check the whole working process for conformity with the requirements.


    2 On-load test-run

    2.1 Preparations

    - Check water supply, air supply and power supply for normal operation

    - Provide the materials required for on-load test-run.

    - Prepare the ground for stockpiling the concrete produced during test-run.

    - Do not carry out on-load test-running until no-load test-run has all been accepted.


    Warning: The concrete produced during test-run can not be used as product.

    2.2 Attention

    - Follow materials proportions to set parameters in prescription selection.

    - Follow no-load test-run check items to recheck.

    - Check the batcher, slant belt conveyor and similar moving units for normal operation. Check supporting parts for looseness.

    Adjust the belt to ensure no off-track running;

    - Check materials charging and discharging gates for normal opening and for looseness. Check travel switches for looseness.

    - Check the flexible connections of measuring mechanisms for looseness and check air-driven connections for air leakage.

    - Check connecting bolts for looseness.

    - Check concrete for conformity with prescription requirements.

    - Check production period and calculate production capacity to see if they satisfy design requirements.


    Follow the check results to adjust items that do not satisfy prescription requirements. And go on with test-run until design requirements are satisfied.


    2.3 Operation steps

    Turn on the power supply master switch to check the electric system to ensure it is normal. If abnormal noise, fume, spark or

    bad smell is found, turn off the switch to trace the cause. If not, turn on the control switch and power supply switches of other

    motors to start up the air compressor, mixer, slant belt conveyor. Do not go on with the next operation until everything is checked OK.

    Start up PC power supply to enter the operation software for concrete production.


    Hand-operated on-load test run.

    - Rotate the manual/auto switch to the “manual” position.

    - Press separately the push-buttons corresponding to their respective storage hopper gates to discharge aggregate into the

    aggregate measuring hoppers. Release the buttons when reaching the measurement values.

    - Press separately the push-buttons corresponding to their respective measuring hopper gates to discharge the measured aggregate

    onto the horizontal belt conveyor, then onto slant belt conveyor and from here into the intermediate aggregate silos.

    - Start up the spiral conveyor concerned to measure cement and coal dust separately. Shut down the conveyor concerned when

    reaching the pre-set value.

    - Start up the water pump to measure water. Shut down the pump when reaching the measurement value.

    - Start up the additive pump concerned to measure the additive. Shut down the pump when reaching the measurement value.

    - Feed the aggregate and measured cement, coal dust, water and additives into the mixer for about 38s mixing operation before

    discharging the mixture.

    - Preproduction requires mixing of three pots of concrete. Calculate the actual deviation of each material from each pot. And

    calculate the actual deviation average of each material from three pots. Follow these averages to check the scale measurement

    accuracy for reaching the specified done.


    Automatically-operated test run.

    - Rotate the manual/auto switch to the “auto” position.

    - Input the proportion to the PC. Follow PC prompts to start up the automatic program, automatic production for the preset parameter

    will be on under PC.


    MODELHZS 60HZS 90HZS 120HZS 180HZS 240
    Theoretical production(m3/h)6090120180240
    MixerModelJS1000JS1500JS2000JS3000JS4000
    Power(kw)2*18.52*302*372*552*75
    Output(L)10001500200030004000
    BatcherHopper capacity(m3)1015182224
    Hopper quantity33444
    Hopper Quantily100150250350500
    Weighing Scope And AccuracyAggregate(kg)2000±2%3000±2%4800±2%8000±2%10000±2%
    Cement(kg)600±1%900±1%1200±1%1800±1%2000±1%
    Powder(kg)600±1%900±1%1200±1%1800±1%2000±1%
    Water(kg)200±1%400±1%500±1%800±1%900±1%
    Admixture(kg)30±1%30±1%30±1%30±1%30±1%
    Total Power(kw)132177220280320
    Discharge Height(m)4.14.14.14.14.1

    Note:

    1.The total power does not include the power of screw conveyor;

    2.The quantity of hopper can be designed as required;

    3.The design can be changed as the customer ask.

    Achieve Innovations (Changsha) Co.,Ltd.

    ♥. A leading Supplier in the Construction Machinery Industry for Premium quality China-made Products
    ♥. Specializing in Concrete Machinery, Used & Recondition, Tailor-made Equipment & Parts
    ♥. We are a professional team, over 10 years experience in this industry.


    ♥.Achieve batching plant factory focused on the domestic market and sells more than 200 sets of batching

    plants in the local market every year. It has participated in many major construction projects in China, and

    ranked top five in sales of the batching plant,it is the largest buyer of SICOMA mixer, which is the domestic

    first-class mixer brand. Chinese customers have a better understanding of Chinese products,The huge sales

    in China help us accumulated rich experience in the production and quality of our batching plant, and the large

    procurement also help us reduced the procurement costs. Now, with the professional international trade ability

    of the Achieve overseas team, Achieve batching plant has been exported to more than 10 countries in

    Southeast Asia, Central Asia and Africa.In the future, Achieve batching plant will serve more countries and customers.

    Quality MEO1000 Ready Mixed Concrete Mixing Plant 60 Cbm 240 Cbm Per Hour for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Achieve Innovations (Changsha) Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)